SEWERAGE NETWORK DESIGN

Sewerage network designPYLOS, MESSENIA, GR


The sewerage network in the area was incomplete, leading to problems in sewage management.

Consequently, the area was in need of additional network design and new sewage pipes.

The design of Pylos’ sewerage network was included in a previous project and our team was called to conduct additional design.

Our team provided solutions on the entirety of project’s useful life.

The project was divided into two main collectors and four secondary collectors.

200 mm PVC pipes were used throughout the network, with the provision of manholes per 50 m to ease network’s maintenance and ensure high operability.

Hydro Balance - Σύμβουλοι Μηχανικοί | Υδραυλικές Μελέτες Δημοσίων & Ιδιωτικών Εργων

2018

Project starts

92k €

Estimated construction budget for the sewerage network

336 m

The total collector’s length

KEY POINTS

Technical

Hydraulic modelling and complete detailed design

Money

Cost-effective and sustainable wastewater management

Life Cycle

The project was designed with a 40-year horizon

Design Duration

Project’s completion took 1 month

Value

Provided the client with a cost-effective solution for sewerage network management

Compliance

In accordance with the national legislation

Environment

The scheme promoted safe sewage management with respect to environmental practices