Stream training- SIMIADES, ARCADIA, GR


In Simiades, Arcadia, it was necessary to complete a detailed stream training analysis related to the stream flowing in the region.

In order to preserve the natural environment, stream boundary lines and flood plain map were defined for the area of interest.

The flow rate was calculated in the hydrological assessment for a return period equal to 50 years.

Our team completed a thorough assessment used a rigid scientific method and approved software.

The principal idea was to maintain the natural riverbed and propose constructional improvements only where necessary.

As a result of the stream training analysis, the stream was proposed to remain unchanged from its natural geometry, as the flow is restricted between the natural river boundaries.

Hydro Balance - Σύμβουλοι Μηχανικοί | Υδραυλικές Μελέτες Δημοσίων & Ιδιωτικών Εργων

73.3 m3/s

Run-off relevant to 50-year flood

1080 m2

River basin area

600 m

The total stream length

KEY POINTS

Technical

Full 1D/2D River Hydraulic Modelling and desktop assessment

Money

Stream boundary definition in relation to adjacent properties

Return period

The project is designed for a 50-year fluvial return period

Design Duration

The project was completed in 2 months

Value

Flood risk mitigation and preservation of natural environment

Compliance

In accordance with the national legislation